A tightness test shows whether gas pipework leaks; purging clears air or gas from pipework as it goes into or out of service. In commercial premises engineers work to IGEM/UP/1, or IGEM/UP/1A for small low-pressure natural gas installations, and a stand-alone test and purge is recorded on a CP16. Book a CP17 inspection online.
By the London Gas Cert team Updated How we write and check our pages
7 min read
A tightness test shows whether gas pipework leaks. Purging clears air or gas out of pipework safely when it's put into service or taken out of it. In commercial premises, both follow procedures published by the Institution of Gas Engineers and Managers (IGEM): IGEM/UP/1 for industrial and commercial installations, or IGEM/UP/1A for small low-pressure natural gas installations. A routine tightness test is usually part of a commercial gas inspection (CP17); when testing and purging is a job on its own, it's recorded on a CP16.
What are strength testing, tightness testing and purging?
Three related procedures on gas pipework, all covered by IGEM/UP/1: strength testing, tightness testing and direct purging of industrial and commercial gas installations. Each answers a different question, and they're often carried out in sequence.
| Procedure | What it's for | When IGEM/UP/1 applies it, in summary |
|---|---|---|
| Strength test | Showing that new pipework, or an extension, can withstand the pressures it could meet under fault conditions | New pipework and new extensions |
| Tightness test | Showing that the pipework doesn't leak | New, altered or reused pipework; before work on existing pipework; a known or suspected leak; a complete loss of pressure; routine testing; immediately before purging |
| Direct purge | Clearing air or gas from pipework | New, altered or reused pipework; a complete loss of pressure; possible air in the pipework; pipework taken out of service |
Tightness or soundness?
They're the same thing. IGEM's procedures say that the older term, soundness testing, and tightness testing have an identical meaning, so a quote or a report may use either.
When does a commercial installation need a test or a purge?
Whenever the pipework is new, altered, suspect or being taken out of use. IGEM's summary of IGEM/UP/1 lists when strength and tightness testing applies: new pipework; the alteration, replacement, reuse or upgrading of existing pipework; new extensions; before any work on existing pipework; a known or suspected gas leak; a complete loss of pressure for any reason; routine testing of existing pipework; and immediately before purging, except when pipework is being taken permanently out of service.
For direct purging, the list is new pipework; the alteration, replacement or reuse of existing pipework; new extensions; a complete loss of pressure; the possibility of air in the pipework; and pipework being taken out of service, temporarily or permanently.
What that looks like in London premises
- A restaurant fit-out with a new gas run to the cooking line. New pipework, so it's tested and then purged.
- An office refurbishment that moves a boiler. An alteration to existing pipework.
- A shop unit closing for good, with the gas to be capped. Pipework taken out of service, so a purge.
- A smell of gas near a meter or pipe run. A suspected leak. Call the National Gas Emergency Service on 0800 111 999 first.
- The yearly inspection. Routine testing, usually carried out as part of the CP17 visit.
Which standard applies: IGEM/UP/1 or IGEM/UP/1A?
It depends on the size and pressure of the installation, and the engineer decides. IGEM/UP/1 Edition 2 covers industrial and commercial installations broadly. IGEM/UP/1A Edition 2 covers a special case: small, low-pressure natural gas installations on industrial and commercial premises, with a volume of up to 1 m³ and an operating pressure of up to 40 mbar.
IGEM explains that some activities in IGEM/UP/1 are only needed for larger installations, higher pressures or other gases, which is why IGEM/UP/1A can be simpler. IGEM's own guidance also points domestic-sized natural gas installations to a separate standard in the same series, IGEM/UP/1B.
| Standard | What it covers |
|---|---|
| IGEM/UP/1 Edition 2 | Strength testing, tightness testing and direct purging of industrial and commercial gas installations |
| IGEM/UP/1A Edition 2 | The same, for small low-pressure natural gas installations on industrial and commercial premises: up to 1 m³ in volume and 40 mbar operating pressure |
| IGEM/UP/1B | Tightness testing and purging of domestic-sized natural gas installations |
Why it matters to you
The engineer needs to know about the installation before the visit: the meter, the pipe sizes and runs, and what the pipework serves. Larger or higher-pressure installations involve more steps, so give as much detail as you can when you book, and have any drawings or earlier test records to hand.
Is a tightness test part of a CP17?
Usually. A commercial gas inspection is recorded on a CP17, the Gas Installation Safety Report (Non Domestic), and typically covers the appliances, flues, ventilation, gas pressures, combustion and the meter, together with a tightness test of the installation pipework. When testing and purging are carried out as a job in their own right, for example after new pipework has gone in, the engineer records them on a CP16, the Gas Testing and Purging Form (Non Domestic).
| Form | Title | What it records |
|---|---|---|
| CP17 | Gas Installation Safety Report (Non Domestic) | An inspection of the installation, usually including a tightness test |
| CP16 | Gas Testing and Purging Form (Non Domestic) | A tightness test and purge carried out as a job on its own |
| CP15 | Plant Commissioning / Servicing Record (Non Domestic) | Commissioning or servicing commercial plant |
A CP16 isn't a safety inspection of the whole installation, so it doesn't replace a CP17. A stand-alone test and purge is also a separate job from the inspection and isn't included in the CP17 price. Our commercial gas safety certificate page explains what the inspection covers.
Who can test and purge commercial pipework?
A Gas Safe registered business, with an engineer who holds the right commercial categories. Gas work may only be done by, or by an employee of, a member of the class of persons approved by HSE, which is the Gas Safe Register (GSIUR reg 3(3)). Gas Safe Register's commercial work categories include Commercial Pipe work commissioning, defined as competence in the testing and purging of commercial pipework, and Commercial Pipe work, which covers installing and removing gas pipework larger than 35 mm in diameter.
A domestic-qualified engineer may work in small commercial premises only within the limits Gas Safe Register sets for domestic scope, which depend on the meter, the pipe size and the installation volume, and only where there are no other non-domestic appliances. Beyond those limits, non-domestic categories are needed. HSE's guidance says the back of the engineer's Gas Safe ID card shows the areas of gas work they're competent in; our guide on how to check a Gas Safe engineer explains what to look for.
What happens on the day?
Plan for the gas to be off for a while. A tightness test usually means turning the gas off, so time the visit around opening hours, kitchen service and heating demand.
- Tell us when the gas can be off with the least disruption.
- Make sure the engineer can reach the meter, the emergency control valve, any plant room and the pipework test points.
- Have drawings, and any earlier CP16 and CP17 records, to hand.
- Name a site contact who knows the building and where the keys are.
If the test fails
A failed tightness test means gas may be escaping, and the next step is finding the cause. Anything unsafe is classified Immediately Dangerous or At Risk under IGEM/G/11, the gas industry unsafe situations procedure, and with your permission made safe and backed by a warning notice. Once repaired, the pipework is tested again before it goes back into use: IGEM/UP/1 applies testing to any alteration or replacement of pipework.
What paperwork should you keep?
Keep each CP16 with your CP17 inspection reports, any CP15 servicing records and your repair invoices. Together they show how the installation has been tested, inspected and maintained, which is the kind of evidence insurers, landlords and inspectors usually ask for.
The legal duty behind them is regulation 35 of the Gas Safety (Installation and Use) Regulations 1998: every employer and self-employed person must keep gas appliances, pipework and flues at a place of work under their control in a safe condition. There's no fixed legal interval for commercial inspections; HSE says annual inspection is a reasonable minimum. If you lease your premises, our guide to gas safety in a commercial lease covers who usually arranges the work.
Key points
- A tightness test shows whether gas pipework leaks; a strength test shows new pipework can withstand fault pressures; purging clears air or gas from pipework.
- IGEM/UP/1 covers industrial and commercial installations; IGEM/UP/1A covers small low-pressure natural gas installations of up to 1 m³ and 40 mbar.
- Testing applies to new, altered or suspect pipework, before work on it and before purging; purging applies when pipework goes into or comes out of service.
- A routine tightness test is usually part of a CP17; a stand-alone test and purge is recorded on a CP16.
- The engineer needs commercial categories such as Commercial Pipe work commissioning, unless the work is within domestic scope.
Book a commercial gas inspection
Book a commercial gas safety certificate (CP17) online, and tell us about any recent pipework changes. Price: Price confirmed on booking; see our prices. Book online or call 020 8058 4241. For schools, offices and churches, see our guide to gas safety in schools, offices and churches.
Sources for this page
Facts checked . General information, not legal advice.
- IGEM: https://www.igem.org.uk/resource/ige-up-1-edition-2-a-2005-strength-testing-tightness-testing-direct-purging-of-industrial-and-commercial-gas-installations.html
- IGEM: https://www.igem.org.uk/resource/ige-up-1a-edition-2-a-2005-strength-tightness-testing-purging-of-small-low-pressure-industrial-commercial-installations.html
- CORGIdirect: https://www.corgi-direct.com/non-domestic-gas-forms-18025-0000
- CORGIdirect: https://www.corgi-direct.com/corgidirect-gas-installation-17950-3420703
- Gas Safe Register: https://www.gassaferegister.co.uk/media/1826/defining-the-commercial-id-card-work-categories.pdf
- registeredgasengineer.co.uk: https://registeredgasengineer.co.uk/technical/technical-bulletin-014-b-working-within-scope-of-work-categories/
- legislation.gov.uk: https://www.legislation.gov.uk/uksi/1998/2451/regulation/3
- legislation.gov.uk: https://www.legislation.gov.uk/uksi/1998/2451/regulation/35
- legislation.gov.uk: https://www.legislation.gov.uk/uksi/1998/2451/regulation/26
- IGEM: https://www.igem.org.uk/resource/igem-g-11-edition-2-gas-industry-unsafe-situations-procedure.html
- HSE: https://www.hse.gov.uk/pubns/cais23.htm
- HSE: https://www.hse.gov.uk/gas/domestic/faqlandlord.htm
- HSE: https://www.hse.gov.uk/gas/domestic/co.htm